Welcome to Shanwei Yiqiang Technology Engineering Co., Ltd.
Language 中文 English
Dust-free workshopCurrent location: Home > Dust-free workshop > Dust-free workshop

8 requirements for the construction of clean workshop purification projects:

 1. The ground treatment is self-leveling ground treatment, and a 2mm thick PVC floor is laid.

 2. According to the requirements of GMP standard, clean room should be designed and installed to avoid difficult-to-clean parts during use. During the purification and decoration of this project, the installation of doors and windows and the construction, purification air conditioning, various pipelines, lighting fixtures The joint gap should be sealed.

 3. All accessories, partition walls, ceiling fixings and hanging parts can only be connected with the main structure, and cannot be used in cross-use with equipment and pipeline supports to prevent the decoration materials from loosening and dust falling off due to micro-shocks.
 4. The gaps in architectural decoration and doors and windows should be sealed on the front.

 5. According to GMP certification inspection standards, interior decoration must meet the following requirements:

 a. Materials with good air tightness and small deformation under the action of temperature and humidity should be selected.

 b. The surfaces of walls and ceilings should be smooth, flat, free from dust, dust-free, corrosion-resistant, impact-resistant, easy to clean, and reduce uneven surfaces. The junction of the wall and the ground shall be rounded with a radius equal to 50mm. Wall colors should be harmonious, elegant, and easy to identify contaminants.

 c. The doors and windows and the inner wall should be straight, and the structure should fully consider the sealing of air and water vapor, so that the pollution particles are not easy to infiltrate from the outside and prevent condensation due to the temperature difference between indoor and outdoor. The inner doors, inner windows and partitions and other gaps between rooms with different cleanliness must be sealed.

 6. During the construction of the clean workshop, the amount of dust generated in the construction operation should be controlled, especially the hidden spaces such as the ceiling and the interior of the sandwich wall, which must be cleaned at any time.

 7. In the room where the high-efficiency filter has been installed, the decoration operation with dust cannot be carried out.

 8. Pay attention to protect the completed work surface, and do not cause contamination of the board, dark cracks and surface decoration due to impact, beating, trampling, and multi-water operations.

 Shenzhen Jiarui Construction Electromechanical Engineering Co., Ltd. integrates production, research and development, design and construction, and is committed to the improvement of air purification projects and the decoration of the appearance. Starting from customer needs, carefully designed and strictly constructed, it is installed in major cities across the country. There are branches to provide customers with convenient and thoughtful professional technical support and after-sales service, and can provide customers with high-performance purification products. The company has a professional service team, skilled technicians and strong support, it is definitely your first choice for air purification projects such as air equipment purification, clean workshops, clean rooms, dust-free workshops, etc.!

About Us
Company Profile
Development path
Certifications
Cases
Creative fashion
Modern minimalist
LOFTI industry
Modern chinese
Decoration style design
Creative fashion
Modern minimalist
LOFTI industry
Modern chinese
Dust-free design
Application
Contact us
Contact Us
Feedback
  • Address: Yiqiang Technology Engineering Co., Ltd. in the middle section of Industrial Avenue, Shanwei City
  • Tel: 0660-3395388
  • Mob: 134-1105-2288
  • Contact: Miss Xu
  • E-mail: yiqiang_gs@163.com
Follow the applet
Follow the website
Online service
Scan it