The purification workshop project is widely used in food workshops, electronic workshops and other places where purification needs are required to ensure the environmental quality of the workshop; the construction process of the purification project is to communicate with customers in the early stage, see the scene, and make preliminary investigations according to the previous stage. After the plan is confirmed, the contract is signed and construction is carried out, and the final debugging, acceptance and maintenance can be completed.
1. Construction process of clean project
1. Communicate and see the scene
Before a project is carried out, it is necessary to fully communicate with the customer and conduct on-site inspections, and to know what the other party wants, in order to determine a reasonable plan.
2. Design
The clean engineering company needs to make a preliminary design plan to the customer based on the previous communication and on-site inspection, and adjust it according to the customer's requirements.
3. Program exchange
The formation of a plan often takes many exchanges, and the final plan can only be determined after the customer is satisfied.
4. Sign the contract
This is a business negotiation process. Because now any project still needs a contract before construction, and only acting in accordance with the contract can ensure the rights and interests of both parties. This contract must specify the clean construction process and the cost of the project.
5. Design and construction drawings
After the contract is signed, the construction drawing will be produced. This step is very important, because the subsequent cleaning project is carried out in strict accordance with this drawing. Of course, the construction drawings must conform to the plan negotiated before.
6. Construction
At this stage, the construction can be carried out in strict accordance with the construction drawings.
7. Debugging detection
After the completion of the project, it is necessary to carry out debugging according to the requirements of the contract and the acceptance specifications, and to check whether the various processes meet the standards.
8. Acceptance
If the test is correct, the next step is acceptance, and it can be put into formal use after the acceptance is completed.
9. Maintenance
This is regarded as after-sales service. The construction party can't think that it can be completely ignored after the completion of the work. It still needs to take some responsibilities and do some post-service services for the warranty of this clean workshop.